Made in Sweden
LCOE towards 2018 below €129/MWh Potentially <100€/MWh, by 2030. (UK/ETI)
Completed:
In Progress:
Note: significant engineering based on more detailed input needs to be undertaken to determine the final configuration and structural weight. Numbers presented are to be seen as indicative. Furthermore, Hexicon does not have insight into competitors’ technology development nor results thereof.
Assuming WTGs of 10 MW with rotor diameter of 180 m WTG spacing can be reduced after proof of concept and further development of active heading control. There is nothing indicating that Hexicon should not be competitive hosting very large WTGs (note however that the most efficient projects may not necessarily be developed using the largest available machines, any given project will need work identifying the optimum WTG size)
CURRENT MAIN MARKETS
ECONOMIC DEVELOPMENT
PROJECT DEVELOPMENT
TAIWAN
FRANCE
JAPAN
ATLANTIC ISLANDS
USA
Swedish Design & Engineering
Draught: 5 m
Water depth: 150 – 3000 m
Built: 1986
Still in operation
Source: GVAC.se
Swedish Design & Engineering
Draught: 15 m
Water depth: 35 – 1000 m
To be built: 2017
Operation: 20-25 years
Source: hexicon.eu